Hydronic Outdoor Wood Boiler Installation in Vermont in front of Houseneeds, Inc Office

Picture 1: The frame build with re-bar and a six inch pour with the ZSupply Insulated PEX and Wire Conduit protected from the pour.

The frame build with re-bar and a six inch pour with the ZSupply Insulated PEX and Wire Conduit protected from the pour

Picture 2: The cement being poured in

The cement being poured in

Picture 3: The Empyre Elite XL-200 Outdoor Wood Boiler on a flatbed trailer with the back door open to remove the cutouts to allow the insulated pex tubing to enter.

The Empyre Elite XL-200 Outdoor Wood Boiler on a flatbed trailer with the back door open to remove the cutouts to allow the insulated pex tubing to enter

Picture 4: The Empyre Elite XL-200 brought from our warehouse by a flatbed trailer and to be lifted off the trailer.

The Empyre Elite XL-200 brought from our warehouse by a flatbed trailer and to be lifted off the trailer

Picture 5: The Empyre Elite XL-200 being lifted off the flatbed trailer.

The Empyre Elite XL-200 being lifted off the flatbed trailer

Picture 6: The Empyre Elite XL-200 being lifted into position over the cement slab that was poured 2 weeks prior.

The Empyre Elite XL-200 being lifted into position over the cement slab that was poured 2 weeks prior

Picture 7: The Empyre Elite XL-200 being positioned over the Z-Supply Insulated PEX Tubing and Wire Conduit. The Protective outer shell of the Insulated PEX Tubing has been removed about 7 inches above the slab

The Empyre Elite XL-200 being positioned over the Z-Supply Insulated PEX Tubing and Wire Conduit. The Protective outer shell of the Insulated PEX Tubing has been removed about 7 inches above the slab

Picture 8: Another Picture of the Empyre Elite XL-200 being positioned over the Z-Supply Insulated PEX Tubing and Wire Conduit. The Protective outer shell of the Insulated PEX Tubing has been removed about 7 inches above the slab.

Another Picture of the Empyre Elite XL-200 being positioned over the Z-Supply Insulated PEX Tubing and Wire Conduit. The Protective outer shell of the Insulated PEX Tubing has been removed about 7 inches above the slab

Picture 9: The Empyre Elite XL-200 in position and ready to be connected to the main heating system.

The Empyre Elite XL-200 in position and ready to be connected to the main heating system